
What's your guarantee time?

We can provide 18months guarantee period, our service has no time limit.

How to do with the elevator installation and maintenance?

We can send engineers to guide the installation and then train the workers about maintenance in the future. But in most situations, local workers can finish this work with our guidebooks and technology support, or you can ask the local professional elevator engineers to do this job, This can save much money for our customer. Of course, you can get support from our factory at any time.

What about the packaging?

All elevator parts will be packed into solid wooden cases. Some parts will be wrapped in film to ensure that the mechanical components are not damaged after long time of transport.

Why choose us?

Asia Fuji Elevator is a joint-stock enterprise integrating elevator R & D, design, production, sales, installation and maintenance. It is a well-known brand and has been affirmed by many customers The sample projects at home and abroad are the recognition of our quality by customers.

What advantages do you have?

The intelligent production line adopts ABB6700 series products, and adopts 360 rotation type, from feeding to bending, to enter the roll line turnover work, and at the same time, enters the stiffener, head, gluing and arc welding process. These technology could guarantee the machine accuracy.

What information is absolutely needed before asking for price?

1. How many persons? ( 6 persons for 450kg, 8 persons for 630kg, 10 persons for 800kg etc..)
2. How many floors/ stops/ doors?
3. What’s the shaft size? (width by depth)
4. Is there a machine room on the top of shaft?

How can we guarantee the good quality of your products?

During the production process, we inspect all purchased and manufactured components and make a record of them after they have been crated. Before delivery we do a final check and simulate the cabin and slings, this part is photographed and videoed as a record to reassure our customers.

What’s the payment team?

(1) The buyer shall pay 30%of the total amount by TT in advance within 3 working days since signing the contract, the balance payment of 70% shall be paid in 20days before shipment.
(2)The delivery time is valid from the arrangement of 30% deposit and stamped and signed shaft layout drawing by both parties.

Elevator solutions