Strict QC inspection during the production and before packing

We spend a great deal of labor and time to checking the elevator carefully, every tiny part is fitted in place. After many years, the elevator will not be impacted by just missing a screw. Not only does this greatly reduce the stress of on-site installation, but it is also a requirement and guarantee of the high quality of our elevators.

The Packing System

The packing material will use WOODEN BOXES as standard export packing.

01

Safety of Transportation

We use fumigation-free wooden boxes with disinfection. The thickness is no less than 100mm. Ensure the safety of transportation.

图片名称

03

Unique Code

Each elevator has our unique code, including the parts used will be recorded in detail, which is convenient for future maintenance and replacement.

图片名称
图片名称

02

Modular Packing System

Each box will be packaged with a detailed list of packing list, which is more clear and convenient for on-site installation.

图片名称

04

The Delivery Time

30-35 working days upon signed documents and deposit received. Port of loading: Qingdao Port, China.

Our Shipping

We will provide the best ,safest and the most efficient transport, Support Sea Transportation, Rail Transportation.

When you receive the elevator, we can establish a WhatsApp group, our engineers, you, and your installer will be in this group. We will help solve any problems in time through online video.

One Belt, One Road